Total Waste Services Media

Customized Blast Booth Spec Sheet

May 8, 2019

View Full Spec Sheet

MPW’s stainless steel blast booth is designed specifically for industrial coatings removal in the cleaning process. Built to contain messy water blast and overspray, the temperature-controlled blast booth is equipped with circulating air filtration to increase visibility and also filter and remove steam.

Carbon

Read More

Defect Analysis Spec Sheet

April 24, 2019

View Full Spec Sheet

MPW provides the expertise

Read More

MPW thinks outside the box to solve chain-cleaning problem

April 24, 2019

 View Full Case Study 

A heavy- and medium-duty commercial truck manufacturer in Ohio sought to optimize the cleaning of its towveyor chain, which functions like a conveyor to transport vehicle parts throughout the plant.

Because of the 1,800-foot chain’s tremendous heft, plant personnel cleaned it only

Read More

MPW climbs to new heights to conquer deep-cleaning project

April 24, 2019

 View Full Case Study 

A South Carolina automotive original equipment manufacturer (OEM) needed a team with the capability to deep clean the entirety of its facility from bolts to beams—truly an industrial-sized feat. Main keys to the project were cost and finding a contractor with the

Read More

MPW resolves deep clean dilemma for aluminum manufacturer

February 15, 2019

View Full Case Study 

An aluminum rolled-product manufacturer in Kentucky needed a deep cleaning to a standard that would eliminate the contamination of its products.

Due to recent construction which exposed large portions of the facility to inclement weather, dirt and debris were prevalent throughout the 90,000 square-foot building and in

Read More

MPW completes comprehensive combustible dust project within one weekend

February 15, 2019

 View Full Case Study 

A document-shredding facility in Texas faced a significant buildup of combustible dust on its walls, floors and rafters. As the paper was shredded and compacted into bales for later recycling, particles accumulated into a dangerous layer of combustible dust that was approximately one-half inch thick.

After

Read More

MPW deep clean allows smooth commissioning process for food manufacturer

February 15, 2019

 View Full Case Study 

Before a custom food manufacturing company could commission a new facility in Ohio it would have to pass stringent FDA regulations and inspections.

The walls, ceilings, floors, fixtures, conveyors and metal racks in the facility’s expansive thaw room, meat cooler and decant room needed to be deep

Read More

Featured Branch: Volkswagen, Chattanooga, Tenn.

February 4, 2019

Facility & Environmental Management Division

Discuss your branch’s dedication to safety.

We stress individual and team safety. We do daily toolbox talks, check for proper PPE and work to ensure everyone’s safety. We emphasize safety constantly, through Safety Observations, Safety Coin checks and safety audits.

Discuss any recent MPW success stories involving your

Read More

MPW excels in eliminating 40 years of carbon dust buildup

February 4, 2019

 View Full Case Study 

America’s largest manufacturer of activated carbon had been in production for over 40 years but had never been deep cleaned.

Walls, floors and process equipment were black from approximately a quarter-inch of accumulated carbon dust, which also created a breathing hazard

Read More

First Line of Leadership

December 5, 2018

MPW withstanding volatile labor market by investing in training

By Jimmy Peck, ICG General Manager and Matthew Dawson, Director of Training & Development

The Great Recession of 2008 marked a major turning point in the history of the U.S. labor market. Though the aftermath of a global financial crisis caused unemployment to rise substantially

Read More
Scroll to Top