Home » water blasting

water blasting

Why We’re Involved with the WJTA

May 23, 2019

By Jimmy Peck, General Manager, MPW Industrial Services

This industry is more than a commodity to the WJTA. This is one of the most important lessons I learned last year as I completed my first year on the WJTA Board of Directors. It’s one of the many concepts that mirror MPW’s culture.

Customized Blast Booth Spec Sheet

May 8, 2019

[wp-svg-icons icon=”file-2″ wrap=”i”] View Full Spec Sheet

MPW’s stainless steel blast booth is designed specifically for industrial coatings removal in the cleaning process. Built to contain messy water blast and overspray, the temperature-controlled blast booth is equipped with circulating air filtration to increase visibility and also filter and remove

MPW announces opening of branch in Queensbury, N.Y.

August 2, 2018

QUEENSBURY, N.Y. — MPW Industrial Services today announced the opening of its branch location here.

About 60 miles north of Albany, N.Y., the branch specializes in industrial cleaning, including high-pressure water blasting and vacuum truck services.

MPW named David Cronk branch manager and Michael Otruba operations manager. Cronk has more than 23 years

MPW’s improvements lead to savings for Southeastern pulp and paper facility

August 21, 2017

[wp-svg-icons icon=”file-2″ wrap=”i”] View Full Case Study

Problem

A Florida pulp and paper mill faced a complicated, dangerous process to clean its power boiler during scheduled outages.

Previous efforts to clean the boiler included manual water jetting from scaffolding, which posed a safety risk to workers

Cyclone Cleaning Service Video

August 21, 2017

MPW removes 210,000 pounds of tar, decommissions tank

August 21, 2017

[wp-svg-icons icon=”file-2″ wrap=”i”] View Full Case Study

Problem

A steel plant located in Southwestern Ohio recently constructed a new tar tank to replace its old 700,000 gallon tar tank. The decommissioned tank had been out of service since 2008. The plant wanted the tank and its contents of

Core values drive MPW to stellar results at Southeastern pulp mill

August 21, 2017

View Full Case Study

Problem

A prime example of a company following through on its stated values is MPW’s outage project at a Georgia pulp mill.

While competing companies struggled to meet the facility’s needs in terms of efficiency and safety, MPW had excelled at the

Scroll to Top