MPW’s Mobile Command Centers allow continous, on-site monitoring providing a convenient and customized solution. The Mobile Command Center provides a fully automated, continuous analysis of effluent water specifications. A manual sample may be taken from an easy-access lab faucet. The lab is climate controlled
…
MPW Industrial Services celebrated the grand opening of its Technology Center July 19 at MPW’s 46-acre campus in Hebron. The 86,000-square-foot facility was designed to house MPW’s growing Engineering, Fabrication and IT teams.
“In 2010, our IT department consisted of just six team members,” said MPW IT Director Tony Miller. “Today we’ve grown to over
…
In January, the Honda Manufacturing facility in Greensburg, Indiana named an RFG/MPW team its Recognized Associate of the Month (RAM). The team is comprised of Tony Sneed (far left), Jamie Purvis (second from left) and Ricky Couch (far right). Honda Materials Engineer Jon Wang (second from right) said the team was extremely helpful
…
- « Previous
- 1
- …
- 16
- 17
- 18