View Full Case Study Problem At a waste-to-energy facility in the Midwest, an industrial cleaning contractor was using a series of mechanical winches to remove pluggage and ash deposits from the boiler tube lanes which span the mud drum and steam drum. Two technicians would control the winch while a third tech functioned as a […]
Read More